QFT
LOADING
Zanjadora de disco en operación
Energy & telecommunications infrastructure — Mexico

#Building the Future underground.

Horizontal directional drilling, RockSaw trenching, GPON and fiber optic networks, steel and PE pipelines, and specialized civil works. Turnkey solutions for the projects moving Mexico forward.

Start a project
+0 km
Of networks built
0
Mexican states
0
Owned specialized machines
0 años
Years of group track record
01 Who we are

Experience and commitment in every project.

The future needs energy to expand, and infrastructure to carry it to every corner of the country. QFT Ductos exists to build it.

We emerged in 2022 as a specialized extension of Corporativo Quazar S.A. de C.V., active since 2008. Since then we have evolved into a provider of first-class turnkey solutions in pipeline installation, fiber optic networks, energy pipelines and civil works, bringing trained crews and high-performance machinery to every work front.

Mission why we exist

To provide high-quality turnkey solutions in energy and telecommunications infrastructure, using cutting-edge technology and a trained, committed workforce, contributing to the development of communications and energy infrastructure in Mexico with a focus on safety, efficiency and environmental sustainability.

Vision where we are going

To be Mexico's leading infrastructure services company, recognized for operational excellence, technological innovation and commitment to safety and the environment; our clients' preferred partner for critical infrastructure projects.

Values how we work

  • Safety
  • Quality
  • Innovation
  • Responsibility
  • Commitment
02 What we do

Servicesservices

Our own installed capacity to execute underground infrastructure projects end to end: from layout and drilling to testing and as-built drawings.

S.01

Horizontal Directional Drilling (HDD)

Trenchless crossings under roads, rivers and structures with Vermeer, American Augers, Case and Ditch Witch rigs. Includes bore planning and trajectory control.

S.02

Open-cut trenching

Trenching with disc RockSaw units for rocky ground and backhoe for conventional trenches, including asphalt and concrete road reinstatement.

S.03

Fiber optic & GPON networks

Construction of GPON and FTTH networks, multi-duct PE conduit, installation of manholes, mini manholes and handholes, certified fusion splicing.

S.04

Butt fusion & electrofusion

Joining of polyethylene pipes of various diameters with controlled procedures, on-site records and tightness, porosity and destructive testing.

S.05

Steel & PAD pipelines

Steel pipe welding, pipe and valve coatings, gauging and cleaning tests, and PAD duct installation for drainage and conveyance.

S.06

Civil works & earthworks

Earthworks, shoulders, pipe foundations, induced works and complementary specialized activities for infrastructure projects.

03 Equipamiento

Ourfleet.

We operate our own high-performance machinery, allowing us to respond quickly, control quality on every front and guarantee operational continuity without third-party dependence.

Cuadrilla QFT junto a perforadora direccional Vermeer
Disc trencherVermeer CC901999
Disc trencherVermeer CC1351998
Disc trencherVermeer M4751995
Disc trencherVermeer RTX12502012
HDD rigVermeer D36x50 R.A.T.T. — all terrain
HDD rigAmerican Augers DD12002
HDD rigCase RTX2002005
HDD rigDitch Witch JT9202000
HDD rigAztec 20242012
BackhoeJohn Deere 310SG 4×42005
BulldozerCaterpillar D6R2005
SupportAssorted utility vehicles
04 Track record

Projects thatback us up.

From international fiber in Tijuana to the Maya Train and the Interoceanic Corridor: a decade building critical infrastructure for carriers, energy companies and government.

2025

Kantunil — Cancún

Client: Estévez Jor Servicios
Underground network construction for fiber optic deployment over 87.15 km, including construction and repair works on the Kantunil – Valladolid stretch.
Fiber optics87.15 kmQuintana Roo / Yucatán
2025

Navenchauc — Chiapas

Client: FLO Networks
Earthworks, shoulder construction and foundation for hydraulic pipe, directional drilling, electrofusion and installation of 24″Ø PAD duct for water drainage at a hill crossing, including duct, machinery and equipment supply.
HDDPAD duct 24″Chiapas
2024

Tren Interoceánico

Client: Grupo Instalba (SEMAR)
Underground network by horizontal directional drilling and insertion of 6″ HDPE pipe over 72 km for the Trans-Isthmus Train project.
HDDHDPE 6″72 km
2024

Red Internacional Tijuana

International fiber
Underground network of 3 × 1½″ ducts for international fiber deployment, 30 km executed entirely by directional drilling in the city of Tijuana, B.C.
HDD30 kmBaja California
2023

Proyecto IRU

End client: AT&T
Underground PE pipe network with 4″ casing split into 3 × 1½″ ducts for fiber optics — 4 km by directional drilling — plus manhole and handhole installation in the State of Mexico.
HDDManholesState of Mexico
2022

Paseo de las Platas & Fracc. Sadasi

PE gas networks
Construction of 2″ PE networks in Pachuca and Tizayuca, Hidalgo — 10 km combined — using disc trencher, butt fusion and electrofusion. Plus PE tri-duct conduit for fiber optics on the Mexico – Querétaro highway.
TrenchingButt FusionHidalgo
2021

Tren Maya — Tramo 3

Client: Carso
Construction of 10 conduit segments of 6 PAD ducts on Section 3 of the Maya Train, executed by RockSaw trenching.
RockSawConduitSoutheast
2020

Red C5 Seguritech

End client: Seguritech
Underground PE network with 3 × 1½″ ducts for fiber feeding C5 security cameras — 3 km by directional drilling — with aerial and underground cabling, optical terminals, fusion, protocols and testing in Mexico City and the State of Mexico.
Fiber opticsC5Mexico City
2019

10″ steel network — Reynosa

Client: ENGIE
10″ steel supply network executed by directional drilling in Reynosa, Tamaulipas. Additionally in 2020, a 4″ PE and 8″ steel network spanning 6 km with tightness testing and gas commissioning in Tlalnepantla, State of Mexico.
Natural gasHDDENGIE
2018

10″ supply network — Querétaro

Client: ENGIE
Construction of a 10″ steel supply network 3 km long using a disc trencher in the city of Querétaro.
Trenching10″ steelQuerétaro
Ductos de acero
Pipelines & energy
Fusión de fibra óptica
Fiber optics & fusion
Trabajos de zanjeo en Kantunil, Yucatán
In the field — Kantunil, Yucatán
06 How we work

From planningal as-built.

01

Survey & planning

Right-of-way analysis, bore planning, layout and leveling, and definition of the optimal construction method for each stretch.

02

Controlled execution

Drilling or trenching with our own equipment, trajectory monitoring and compliance with international standards on every front.

03

Testing & quality

Tightness, porosity, gauging and cleaning tests; logged butt fusion and electrofusion; verified welding and coatings.

04

Documented handover

As-built drawings, parallelism records, road reinstatement and delivery of the complete technical dossier for operation and maintenance.

Operating right ispart of the job.

Equipo de trabajo QFT Ductos en campo

QFT Ductos' social responsibility is reflected in its commitment to operating ethically, safely and sustainably at every stage of its processes: practices that minimize environmental impact, ensure the wellbeing and continuous training of our people, and strengthen the communities where we work.

Safety firstRegulatory complianceMinimal environmental impactContinuous trainingTransparency
07 Contact

Tell us abouttu project.

Fill out the form and a QFT Ductos specialist will contact you to assess the scope, schedule and costs of your infrastructure project.

We serve projects across all of Mexico: telecommunications, energy, gas, water and specialized civil works.
Request received. Thank you for your interest — a QFT Ductos specialist will contact you shortly.